SkyView Excavation & Grading, Inc. is proud to be part of the Browns Park Road Improvements – Phase 6 project in Daggett County, Utah. This project focuses on roadway stabilization, drainage improvements, erosion control, and safety upgrades along various locations of Browns Park Road between Mile Point 0.00 and Mile Point 24.68.
Building on the long-term improvements that brought continuous pavement to Browns Park Road, Phase 6 addresses critical infrastructure and preservation needs designed to improve the roadway’s durability and performance in the challenging terrain of northeastern Utah.
Project Scope
The project includes a variety of roadway and infrastructure improvements, including:
- Roadway Excavation & Earthwork: Approximately 6,532 cubic yards of roadway excavation and 4,985 cubic yards of granular borrow to support roadway stabilization and reconstruction.
- Drainage Improvements: Installation and replacement of drainage infrastructure, including 30-inch x 19-inch silt-tight reinforced concrete pipe, to improve the conveyance of stormwater and runoff beneath the roadway.
- Erosion & Environmental Controls: Installation of approximately 3,575 linear feet of silt fencing and other erosion-control measures to minimize sediment movement during construction.
- Roadway Safety Improvements: Installation and upgrading of permanent traffic signage and delineation features to improve visibility and roadway safety throughout the corridor.
- Shoulder & Roadway Improvements: Targeted improvements to roadway and shoulder areas to improve long-term stability and performance.
Project Challenges
Working along a remote roadway extending nearly 25 miles presents unique construction challenges. The project requires careful coordination of earthwork, drainage improvements, traffic control, and environmental protection measures while working within the region’s rugged terrain and seasonal weather conditions.
Construction activities are being carefully sequenced to maintain safe access for motorists while completing improvements at multiple locations throughout the project corridor.
Project Schedule
Construction Start: March 16, 2026
Anticipated Completion: Fall/Winter 2026
SkyView Excavation & Grading, Inc. is committed to delivering quality workmanship and reliable infrastructure improvements that will contribute to the long-term safety, stability, and service life of Browns Park Road.