We are excited to be working with Farmington and Kaysville Cities on this project. The project consists of constructing approximately 0.57 miles of new 950 North Roadway from the future West Davis Hwy to 1875 West and 0.87 miles of Sunset Drive/Angel Street from 950 North to Shepard Lane. 950 North Roadway will be constructed with 3 lanes, shoulders and 52-68 ft of asphalt, curb and gutter, sidewalk and 10 foot multi-use trail. Sunset Drive will be constructed with 2 lanes, shoulders, and 40-58 ft of asphalt, curb and gutter, roundabout, sidewalks, fencing, and 12 ft wide multi-use trail.. Project will include installation of box culvert, drainage structures, and pipes, other utilities include (water, sewer crossing, fiber, street lighting) signage and striping, irrigation as well as landscaping. This project is scheduled to be completed by October 2023.