This UDOT project consisted of slip lining a 54″ pipe crossing I-15, 240 LF. On SR-14 we replaced several drainages with new headwalls and riprapped on the ends of the pipe across the highway and replaced old catchbasins with new moving them away from the shoulder of the road.